This is my practical story

I'm student in Kolej Poly-Tech MARA Kuala Lumpur,Malaysia.Now I was Practical at MMASTEC ENGINEERING at Setiawangsa

22-27 November 2010

Sunday, November 28, 2010

22 NOVEMBER 2010
  • I have to prepare letters for all Malaysia Ministry. 


23 NOVEMBER 2010
  • Atiqah Zulkefli and I have to make proposal for MMASTEC new project-Usahawan Bengkel SYOB(Workshop Kereta)
  •  We have meeting with MMastec to finish task which is we have to search content to make 4 website.we have to finish it within in 1 week and make 2 version Bahasa Melayu and English version


            a)Book For Blind
            b)MMastec Engineering
            c)BSM
            d)Keyei


  • Searching for Jakim Director and vice director address ,phone no and fax number also their PA name and number.
24 NOVEMBER 2010
  • Make correction in Proposal SYOB
  • First of all, we have divided the task among seven of us.The task is:

    • Farhanuddean - Search for the MMastec Engineering Sdn Bhd information.
    • Faizzuddin - Search the pictures for MMastec Engineering Sdn Bhd, BSM Bhd, and Book For Blind.
    • Nazri - Searching the projects has been done by MMastec Engineering  Sdn Bhd and BSM Bhd.
    • Puvendren - Search for the BSM Sdn Bhd information.
    • Noor Atiqah - Search the information for Book For Blind.
    • Jasmalina and me - Search the information about the KEYEI.
  • Searching info for Keyei product
  • Make 2 version of language for Keyei product information Bahasa Malaysia and English


25 NOVEMBER 2010
  • Has a meeting with Mr Sheon about our task performance archivement right now.
  •  We have to prepare MMASTEC company profile.


26 NOVEMBER 2010
  •  Fiza,Nazri,me and En Nazroll Salleh has a meeting with Datin Paduka Umi Habibah,Director of  Kementerian Penerangan Malaysia. at Wisma Sime Derby
  • Still continuing send letter via fax to Kementerian Malaysia also make follow up call with them


27 NOVEMBER 2010
  • Continuing searching Keyei product
  • we have been asked to create the collage based on the design that have been done  before this and we are has finished it in 1 PM




0 comments:

Post a Comment